Cabinets cutting template
Drawer Base Cabinet Cut List Template
A base cabinet organized around stacked drawers, slide clearances, front reveals, back stiffness, and serviceable hardware. Use this as a starting point, then change every dimension for your room, hardware, material thickness, and joinery before cutting.

Release boundary for this template
Do not release these plywood parts from nominal dimensions alone. Close the measurement, system, and installation decisions first.
- Field measurement: Measure the finished opening, neighboring front lines, floor variation, and countertop underside before releasing front sizes.
- Hardware and service system: Slide model, box thickness, overlay, pull drilling, and back construction must be approved as one hardware system.
- Installation boundary: Level the box first; scribe fillers and adjust fronts only after the cabinet run is anchored in its final plane.
Use Calculate drawer-box parts and clearance to prepare the input, and Diagnose drawers that rub after installation if the drawing, hardware, or installed condition no longer agrees.
Plan the drawer base cabinet before buying sheets
Start by confirming the finished width, depth, height, access clearances, and load requirements. This template is intentionally made from rectangular plywood parts so you can adapt it without redrawing the whole project. Keep matching pieces grouped together, mark visible faces, and leave room for edge banding, backs, doors, drawers, hinges, or trim that apply to your version.
Use 3/4 inch plywood for the structural parts unless your design calls for another thickness. A template is not a structural rating: add bracing, wall anchoring, weather protection, or a thicker panel whenever the location, load, or local requirements demand it.
Drawer Base Cabinet project-specific checks
Use these checks with the sample parts list before calculating sheet count or making a purchase.
- Select the exact slides and drawer construction before calculating box width, setback, mounting height, or rear clearance.
- Allocate front reveals from the finished opening and neighboring fronts rather than dividing nominal cabinet height blindly.
- Use a captured or applied back that keeps the case square without blocking slide adjustment or removal.
- Confirm pull projection, adjacent-door swing, countertop overhang, and toe-kick height across the full cabinet run.
Drawer Base Cabinet parts list
Material: 3/4 in plywood
Kerf allowance: 1/8 in between cuts
Grain direction: keep visible faces consistent
Part | Size (in) | Qty
-------------------+-----------------+----
Sides | 23-1/4 x 34-1/2 | 2
Bottom | 22-1/2 x 30 | 1
Top stretchers | 4 x 30 | 2
Back | 30 x 30-1/2 | 1
Drawer fronts | 9-3/4 x 29-3/4 | 3Review each part against the actual construction method before cutting. Reduce a shelf or bottom for side-panel thickness where needed, leave back-panel or drawer-slide clearance, and make a test piece for any groove, dado, or hardware opening. Label repeated parts as a batch so their orientation stays consistent.
Check the sheet layout and cut order
Place the largest parts first, then nest matching rectangles around them. Square footage alone cannot tell you the sheet count because saw kerf, grain direction, and the shape of the remaining offcuts matter. Enter this adjusted list in the plywood cut calculator with your real sheet size and blade kerf before purchasing material.
Break full sheets into manageable strips first, then crosscut the final parts. Keep pairs together, label the inside faces, and dry-fit the case on a flat surface before driving final fasteners. The cut list calculator is useful if the project also uses solid-wood rails, trim, or stretchers.
Assembly checks that prevent rework
Dry-fit the major panels, measure both diagonals for square, and confirm that moving parts or equipment have the clearance you planned. Pre-drill near plywood edges, test fasteners in an offcut, and attach the back only after the cabinet or frame is square. Read how to read a cut list and saw kerf explained if you need a refresher before finalizing the layout.
How this template was prepared
The parts list models a common drawer base cabinet carcass or frame so you have named pieces and repeated quantities to review. It deliberately leaves hardware, joinery, edge treatment, structural loads, and site conditions open because those choices change final dimensions. Before cutting, verify every opening and finished dimension, confirm material thickness with a caliper, apply hardware clearances, and review the optimized layout against the drawing or room. For a transparent comparison of common template inputs, see the plywood project yield benchmark.
Make this template yours
Replace the sample drawer base cabinet dimensions with the real job
The sample rows are a planning start. Create a CutList project with the measured dimensions, actual material, blade kerf, grain direction, and approved quantities before releasing parts.
- Free basic layouts
- No login
- No cloud upload
- Works offline
More project templates
Browse the full plywood cut list template library for related builds, then save a revised version in the CutList optimizer app when you want to compare sheet counts or keep the plan for later.